Waterproofing of Elevator Pit at A Block – Al Shoala Building

Description

Crestpoint Building Maintenance LLC successfully completed the waterproofing of the elevator pit at A Block, Al Shoala Building, ensuring long-term protection against water ingress and moisture-related damage.

The project involved specialized injection treatment works to address active leakage and prevent future seepage within the elevator pit area. Our team followed a systematic and quality-driven approach to restore the structural integrity and waterproofing performance of the pit.

Scope of Work Included:

  • Thorough cleaning of the elevator pit area
  • Detailed inspection to identify the exact source of water leakage
  • Injection treatment using:
    • PU foam injection to stop active water leakage
    • Secondary injection material to seal cracks and voids permanently
  • Complete drying of the treated area
  • Water leakage testing to ensure leak-proof performance
  • Application of two coats of waterproofing protective coating for enhanced durability

The project was executed with strict quality control measures and completed within the approved budget and timeline, reflecting Crestpoint’s commitment to delivering reliable, efficient, and long-lasting waterproofing solutions in compliance with industry standards.

Project Images

Project Detail

  • AED 9,500.00
  • Injection Treatment work

Client : Al Naboodah