Tiled Roof Waterproofing Works – V4 J1 Villa, Dubai

Description

Crestpoint Building Maintenance LLC successfully delivered professional roof waterproofing services for the tiled roof area at V4 J1 Villa, Dubai, ensuring long-lasting protection against water leakage and weather-related damage.

The villa was experiencing water seepage through the tiled roof, posing a risk to the structural integrity of the property. Our expert team conducted a thorough inspection to identify leakage points and implemented a proven waterproofing system designed for durability and performance. Using high-quality rubberized silicone materials and advanced application techniques, we restored the roof’s waterproofing integrity and enhanced its resistance to future water ingress.

Scope of Work Included:

  • Comprehensive inspection of the tiled roof area to locate leakage sources
  • Mechanical grinding and full surface preparation for optimal material adhesion
  • Application of high-performance rubberized silicone waterproofing (first coat)
  • Installation of geotextile membrane to improve strength, flexibility, and crack resistance
  • Application of a second thick coat of rubberized silicone waterproofing for maximum protection
  • Controlled blocking of drainage outlets to conduct testing
  • 48-hour water ponding test to ensure complete leak-proof performance

The project was executed under strict quality control standards and successfully passed all waterproofing tests. Completed within the approved budget and schedule, this project highlights Crestpoint’s expertise in delivering reliable, durable, and cost-effective roof waterproofing solutions in Dubai, meeting the highest industry standards.

Project Images

Project Detail

  • AED 45,000.00
  • Tiled Roof Area Waterproofing Works

Client : Al Masaood LLC